Cisco 6260 Installation Manual page 113

Hide thumbs Also See for 6260:
Table of Contents

Advertisement

Chapter 3
Installing a Cisco 6260 with a POTS Splitter Configuration
[0] Go to the IOS command prompt without saving this config.
[1] Return back to the setup without saving this config.
[2] Save this configuration to nvram and exit.
Enter your selection [2]: 2
% Shutdown not allowed for ATM0/0.
Building configuration...
Use the enabled mode 'configure' command to modify this configuration.
Press RETURN to get started!
3.2.19.2.3 Extended Setup Example
This is the extended setup example:
Continue with configuration dialog? [yes/no]: yes
At any point you may enter a question mark '?' for help.
Use ctrl-c to abort configuration dialog at any prompt.
Default settings are in square brackets '[]'.
Basic management setup configures only enough connectivity
for management of the system, extended setup will ask you
to configure each interface on the system
Would you like to enter basic management setup? [yes/no]: no
First, would you like to see the current interface summary? [yes]: yes
Interface
ATM0/0
Ethernet0/0
ATM0/1
ATM0/2
ATM18/0
ATM18/1
ATM18/2
ATM18/3
ATM21/0
ATM21/1
ATM21/2
ATM21/3
ATM26/0
ATM26/1
ATM26/2
ATM26/3
Configuring global parameters:
Enter host name [DSLAM]: sw-ni2-2
The enable secret is a password used to protect access to
privileged EXEC and configuration modes. This password, after
entered, becomes encrypted in the configuration.
Enter enable secret: lqb
OL-2365-02
--- System Configuration Dialog ---
IP-Address
70.0.0.2
172.27.32.156
unassigned
unassigned
unassigned
unassigned
unassigned
unassigned
unassigned
unassigned
unassigned
unassigned
unassigned
unassigned
unassigned
unassigned
OK? Method Status
YES NVRAM
up
YES NVRAM
up
YES unset
down
YES unset
administratively down down
YES unset
initializing
YES unset
initializing
YES unset
initializing
YES unset
initializing
YES unset
administratively down down
YES unset
administratively down down
YES unset
administratively down down
YES unset
administratively down down
YES unset
down
YES unset
down
YES unset
down
YES unset
down
Cisco 6260 Hardware Installation Guide
Installation Procedures
Protocol
up
up
down
down
down
down
down
down
down
down
down
3-25

Advertisement

Table of Contents
loading

Table of Contents