Gate Operator Installation; Step 1 Through 5 - Operator Installation - Viking G-5 Installation Instructions Manual

Vehicular gate operator
Table of Contents

Advertisement

GATE OPERATOR INSTALLATION

GATE OPERATOR INSTALLATION
CAUTION - If Front Mounting Bar is not welded to a frame member that runs the
full length of the gate, the gate operator may damage the gate. Do not weld the
bar or backing plate to a few pickets.
STEP 1
Cut the Front Mounting Bar (the offset bar)
so that:
The bolt center is 4-3/4" from the inside surface of
the gate and 27" to 28" from the gate hinge.
Note: It is recommended to use a frame
member across the full width of the gate.
A backing plate is provided for gates of non-
ferrous construction. Tack weld the bar in place.
Refer to Figure A or B, page 10 or 11 for
proper configuration.
STEP 2
Cut and position the pivot bar according to
Figure A or B, page 10 or 11. Tack weld the
pivot bracket, ensuring that the two bars are
level as shown on the right.
Note: For an Open Outside gate, an additional
bracket will need to be fabricated to obtain the
proper configuration (see Figure B, page 11).
Note: Depending on type of anchor used, it
may be required to enlarge the mounting
holes in the pivot bracket.
12
See Figure A
(Page 10)
For Location
Level Line
TECHNICAL SUPPORT 1 800 908 0884
16

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents