Gate Operator Installation; Step 1 Through 7 - Operator Installation - Viking X-9 Installation Instructions And Safety Information

Vehicular gate operator ul 325 and ul991 listed class i, class ii, class iii and class iv
Table of Contents

Advertisement

GATE OPERATOR INSTALLATION

GATE OPERATOR INSTALLATION
STEP 4
Remount the geared motor on the chassis
accordingly.
STEP 5
Attach the articulated arms to the pivot
bracket and the Motor/Gear Assembly.
NOTE - With the arms at their most
extended position, make sure the two arms
do not go past the straight position.
Additional holes are provided in the pivot
bracket to assist with proper installation
STEP 6
With the cover off, perform the Manual
Release procedure as shown at the bottom of
page 7. The gate can now be moved
Check Operation
manually.
Through Entire
Range of
Ensure that the gate and gate operator move
Movment
freely.
Once it is determined the operator will work
properly, remove the operator and complete
the welding process.
STEP 7
Remount the gate operator. Lubricate the
moving parts (the bushings on the
articulated arm) and tighten the self-locking
nuts in such a way as to not block arm
movement. Leave the cover off until the
limit switches have been adjusted.
17
TECHNICAL SUPPORT 1 800 908 0884
13

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents