GATE OPERATOR INSTALLATION

Concrete Pad Option

1.
Follow the local building code to determine the required depth of the
concrete pad.
2. Pad measurements recommended by Viking Access Systems are at least
24" long, 18" wide and 24" deep to ensure the stable operation of the
operator, and a minimum of 4" above level grade to avoid any flooding of
the machinery.
3. Provide a suf ficient number of conduit pathways for all low power
accessories such as loop detector leads, maglock, non-contact sensors,
contact sensors, safety and other commands. Also provide conduit for the
power supply to the operator.
!
DO NOT run low voltage and high voltage wiring in the same conduit.
!
Provide at least 12 " separation between low and high voltage conduits.
Install a Positive
Stop at Both Ends
of the Track
18"
Operator Cover
Operator Chassis
Center of
Drive Chain
14⅜"
24"
1 2
Track
Gate
4"
16"
24"
Drill for ½ " x 3 ½ "
Red Head Anchor (4)
4"
Minimum
2"
4"
Minimum
11"
Gate Operator
Concrete Pad
2"
8½"
1½"
1½"
13"
Conduit Location
Grade Level
See Note 2
Gate Operator Concrete Pad
VIKING TECHNICAL SUPPORT 1.800.908.0884
Possible Area
for Conduits
(1" Max Height)