GATE OPERATOR INSTALLATION
GATE OPERATOR INSTALLATION
Note: Before starting the installation procedure;
• Open and close the gate manually, making sure there is sufficient space between
the gate and adjacent walls.
• Check that the wheels are turning freely on the track and there are no restrictions
while pushing the gate to the open and closed positions.
• Confirm that there is adequate spacing for the guide rollers and that there are no
restrictions throughout the travel of the gate.
STEP 1
Before anchoring the chassis to the concrete
pad, make sure the gate and operator are
LEVEL and PARALLEL. Minimum distance
between the operator and gate is 3".
STEP 2
Attach the operator to the concrete pad
using Red Head 1/2" x 3-1/2" Anchors.
Follow the manufacturers instructions for
proper installation. Refer to page 11 for hole
center dimensions.
12
TECHNICAL SUPPORT 1 800 908 0884