Fujitsu Primergy BX620 S4 User Manual page 120

Hide thumbs Also See for Primergy BX620 S4:
Table of Contents

Advertisement

Chapter 5 Operations after OS Installation
Only a link down error between a LAN card (onboard LAN) and the switch it connects with, and the
equivalent errors lead to switching of the route. Therefore, if only the switch or LAN card (onboard
LAN) is partially damaged and the route being used is sound at the link level, the route will not be
switched in the team, but the communication with the Team may become an error.
■ Creating a team
Follow the steps below to create a Team.
1
Log on to the Server Blade with administrator privileges.
2
Click [Start] – [Settings] – [Control Panel] – [Intel
®
Intel
PROSet.
3
Select a LAN adapter to incorporate in a Team and right-click it.
4
Click [Create New Team] in [Add to Team].
[Teaming Up Wizard] appears.
5
Select a Teaming type with which you want to create a Team.
• AFT type: "Adapter fault tolerance"
• ALB type: "Adaptive load balancing"
• SFT type: "Switch fault tolerance"
Do not select other team types.
6
Click [Next].
7
Select a LAN adapter to incorporate in a Team and click [Next].
8
Click [Finish].
9
Click [OK] to exit Intel
When the Teaming setting is completed, a virtual adapter "Intel(R) Advanced Network Services
Virtual Adapter" will appear.
Upper protocols will be bound with this virtual adapter.
You cannot bind them with the LAN card consisting of a Team.
The IP address should be specified in this virtual adapter.
10
Restart the Server Blade.
120
®
PROSet.
®
PROSet Wired], and start

Advertisement

Table of Contents
loading

Table of Contents