Rack Installation And Ups Internal Battery Connection - Eaton Powerware 9910 UPS Installation Manual

6000 va models for ibm applications
Table of Contents

Advertisement

Rack Installation and UPS Internal Battery Connection

NOTE If the UPS is pre-installed in a rack, you must first remove the protective shipping
bracket installed on the front of the UPS. See "Removing the Shipping Bracket from the UPS"
on page 34, then continue to Step 22 on page 26 to connect the internal batteries.
To install a UPS or EBM in a rack cabinet:
1.
If your rack has round holes, continue to Step 2. Otherwise, skip to
Step 6.
2.
Locate the four adapter plates that come in the rail kit.
3.
Peel off the covering that protects the adhesive side of one adapter
plate, as shown in Figure 4.
Figure 4. Removing the Adapter Plate Adhesive
4.
Align the adapter plate holes with the holes on one end of a rail.
Press firmly to adhere the adapter plate to the end of the rail, as
shown in Figure 5.
5.
Attach the remaining three adapter plates to the rails.
Eaton 9910 UPS and EBM Installation Guide (6000 VA Models)
Figure 5. Attaching the Adapter Plates
INSTALLATION
S
P-164000007 Rev 1
21

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powerware 9910 ebm9910

Table of Contents