Inspecting The Equipment; Tools Required - Eaton Powerware 9910 UPS Installation Manual

6000 va models for ibm applications
Table of Contents

Advertisement

PREPARATION

Inspecting the Equipment

Tools Required

4
Eaton 9910 UPS and EBM Installation Guide (6000 VA Models)
If any equipment has been damaged during shipment, keep the shipping
cartons and packing materials for the carrier or place of purchase, and
file a claim for shipping damage. If you discover damage after
acceptance, file a claim for concealed damage.
To file a claim for shipping damage or concealed damage: 1) File with
the carrier within 15 days of receipt of the equipment; 2) Send a copy of
the damage claim within 15 days to your service representative.
To assemble the components, you may need the following tools:
S
#2 Phillips
screwdriver
®
S
Medium flat-bladed screwdriver
S
P-164000007 Rev 1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Powerware 9910 ebm9910

Table of Contents