Integrated Accessory Cabinet-Bypass Installation..........Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4...
Page 6
6.3.11 Battery Test ..............6-16 Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
Page 7
WARRANTY....................Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4...
Page 8
Table of Contents This page intentionally left blank. Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
List of Figures This page intentionally left blank. Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
Page 11
Input/Output Ratings and External Wiring Requirements for the Eaton 9E-40, 9E–60/40, and 9E–60/60. . . Table 3-5. UPS External Power Cable Terminations for the Eaton 9E-40, 9E–60/40, and 9E–60/60 ....Table 3-6.
List of Tables This page intentionally left blank. viii Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
AC power to protect the customer's load from power failures. The Eaton 9E 40–60 kVA online power protection system is used to prevent loss of valuable electronic information, minimize equipment downtime, and minimize the adverse effect on production equipment due to unexpected power problems.
The 9E Series UPS offers a High-Efficiency (HE) normal mode with double-conversion on demand that allows the UPS to operate in standby bypass mode. This mode allows the 9E UPS to achieve 98% efficiency while still protecting the load. High-efficiency mode is the default normal operating mode. See Chapter 6, “UPS Operating Instructions,”...
Reduced Battery String Model The Eaton 9E-40 model is configured with six battery strings instead of eight to optimize the run time for 40 kVA with a subsequent reduction in cost and weight. If increased battery run time is required in the future, an upgrade kit is available to increase the internal battery system to eight strings, converting the Eaton 9E-40 to a Eaton 9E–60/40.
Power-off (REPO) control or Mini-Slot communication cards. Using This Manual This manual describes how to install and operate the Eaton 9E 40–60 kVA. Read and understand the procedures described in this manual to ensure trouble-free installation and operation. In particular, be thoroughly familiar with the REPO procedure (see paragraph 6.3.13).
This symbol indicates that you should not discard waste electrical or electronic equipment (WEEE) in the trash. For proper disposal, contact your local recycling/reuse or hazardous waste center. Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
Installation instructions, including site preparation, planning for installation, wiring and safety information, and detailed illustrations of cabinets with dimensional and connection point drawings Refer to the Eaton 9E Integrated Accessory Cabinet-Tie and Bypass Installation and Operation Manual for the following additional information:...
DO NOT DISCONNECT the batteries while the UPS is in Battery mode. Replace batteries with the same number and type of batteries as originally installed with the UPS. Disconnect the charging source prior to connecting or disconnecting terminals. Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
Page 20
Une mise au rebut réglementaire des batteries est obligatoire. Consulter les règlements en vigueur dans votre localité. Ne jamais jeter les batteries au feu. L'exposition aux flammes risque de les faire exploser. Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
W-1 become void. This service is offered as part of the sales contract for the UPS. Contact an Eaton service representative in advance (usually a two-week notice is required) to reserve a preferred startup date.
Table 3-3. Air Conditioning or Ventilation Requirements During Full Load Operation Heat Rejection Model Rating Input/Output Voltage BTU/hr x1000 (kg-cal/hr) Eaton 9E-40 40 kVA 208/208 9.29 (2342) Eaton 9E–60/40 Eaton 9E–60/60 60 kVA 208/208 13.94 (3513) Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
UPS Installation Plan and Unpacking Back Front Right Side Dimensions are in millimeters [inches] Figure 3-1. UPS Cabinet Dimensions (Front and Right Side Views) Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
UPS Installation Plan and Unpacking Front Front Bottom Dimensions are in millimeters [inches] Figure 3-2. UPS Cabinet Dimensions (Top and Bottom Views) Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
If the maintenance bypass solution being installed does not provide such functionality, DO NOT use a single feeder breaker to supply both the UPS and the maintenance bypass. Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
Integrated Accessory Cabinet-Tie (IAC-T) or Integrated Accessory Cabinet-Tie and Bypass (IAC-TB) are the same as listed in Table 3-4. Refer to the Eaton 9E Integrated Accessory Cabinet-Tie and Bypass Installation and Operation Manual listed in paragraph 1.8 for additional IAC-T or IAC-TB wiring and termination requirements.
The power wiring terminals are pressure terminations, UL and CSA rated at 90°C. See Table 3-5 for external power cable terminations. Figure 4-7 and Figure 4-8 show the location of the UPS power cable terminals. Table 3-5. UPS External Power Cable Terminations for the Eaton 9E-40, 9E–60/40, and 9E–60/60 Number and Size of Pressure Termination...
To reduce the risk of fire, connect only to a circuit provided with maximum input circuit breaker current ratings from Table 3-7 in accordance with the NEC, ANSI/NFPA 70. Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
All building alarm inputs require an isolated normally-open contact or switch (rated at 24 Vdc, 20 mA minimum) connected between the alarm input and common terminal. All control wiring and switch contacts are customer-supplied. 3-10 Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
Carefully inspect the outer packaging for evidence of damage during transit. CAUTION Do not install a damaged cabinet. Report any damage to the carrier and contact an Eaton service representative immediately. NOTE For the following step, verify that the forklift or pallet jack is rated to handle the weight of the cabinet (see Table 3-1 for cabinet weight).
Page 34
Inspect the contents for any evidence of physical damage, and compare each item with the Bill of Lading. If damage has occurred or shortages are evident, contact an Eaton service representative immediately to determine the extent of the damage and its impact on further installation.
UPS Installation Plan and Unpacking Figure 3-5. UPS Cabinet as Shipped on Pallet (wood container removed) Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality 3-13...
Page 36
UPS Installation Plan and Unpacking This page intentionally left blank. 3-14 Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
Attach the ramp extension to the front of the ramp by inserting the tabs on the extension into the slots at the bottom of the ramp. If the leveling feet are not fully retracted, turn the leveling feet until they are retracted. Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
Slowly roll the cabinet toward the front of the pallet. Continue rolling the cabinet down the ramp until the cabinet is clear of the ramp (see Figure 4-4). Roll the cabinet to the final installation location. Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
UPS System Installation Figure 4-4. Rolling the Cabinet Down the Ramp Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
Conduit Landing for AC Input, Output, and Bypass, DC Input, and REPO. Wire Hooks (Install conduit to bottom of plate.) Base (Inside View) Figure 4-5. UPS Power Terminal Cover Parts Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
Figure 4-6. UPS Power Terminal Cover Base Installation and Conduit Landing Wire Entry Locations External Battery Cabinet Installation If installing External Battery Cabinets (EBCs), refer to the Eaton 9E External Battery Cabinet Installation Manual listed in paragraph 1.8 for installation instructions.
UPS System Installation Integrated Accessory Cabinet-Bypass Installation If installing an IAC-B, refer to the Eaton 9E Integrated Accessory Cabinet-Tie and Bypass Installation and Operation Manual listed in paragraph 1.8 for installation instructions. After the IAC-B is installed, proceed to paragraph 4.9 if installing Integrated Accessory Cabinet-Distribution;...
Page 45
Install the power terminal cover top using the provided hardware (see Figure 4-9). 10. Install the power terminal cover right and left sides using the provided hardware. 11. Proceed to paragraph 4.13. Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
AC Input to UPS Bypass (A, B, C, N) (A, B, C, N) (See Figure 4-8 for detail) (Optional) (See Figure 4-8 for detail) Back Figure 4-7. Power Terminal Locations 4-10 Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
Phase C (L3) AC Input to UPS Rectifier Phase C (L3) UPS Bypass Phase B (L2) Neutral (N) Phase A (L1) Figure 4-8. Power Terminal Detail Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality 4-11...
UPS System Installation Power Terminal Cover Right Side Installed Power Terminal Cover Power Terminal Cover Left Side Installed Top Installed Back Figure 4-9. Power Terminal Cover Top Installation 4-12 Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
3.2.3, Table 4-1, Figure 4-10, Figure 4-11, and Figure 4-12. Top Rear Panel Interface Terminals (See Figure 4-11 for detail) Mini-Slot Communication Bays (See Figure 4-11 for detail) Back Figure 4-10. Interface Terminal Locations Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality 4-13...
If not already removed, remove the power terminal cover top. Retain the cover top and hardware for later use. 4-14 Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
Page 51
Install the power terminal cover top using the provided hardware (see Figure 4-9). Install the power terminal cover right and left sides using the provided hardware. Proceed to paragraph 4.13. Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality 4-15...
Reinstall the top rear panel by tilting into position and securing the panel using the retained hardware. Reinstall the power terminal cover top using the retained hardware. 4-18 Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
Page 55
NOTE LAN drop for use with Mini-Slot cards must be provided by the customer. For installation and setup of an Mini-Slot card, contact an Eaton service representative (see paragraph 1.8) To install wiring: If not already installed, install the LAN drop.
Page 56
UPS System Installation Figure 4-17. Parallel UPS Control Wiring 4-20 Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
Install the power terminal cover right and left sides using the provided hardware. Connect the wiring as shown in Table 4-4 and Figure 4-20 for a normally-open REPO or Table 4-5 and Figure 4-21 for a normally-closed REPO. 4-22 Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
(Either Block) on Back of UPS Cabinet Wire Size Tightening Torque 3 NO Twisted Wires (2) 7 lb in 1422 AWG (0.8 Nm) 4 NO (0.754.0 mm Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality 4-23...
Connect the black connectors (see Figure 4-24) for each set of batteries on the battery shelf. Connect the red connectors (see Figure 4-24) for each set of batteries on the battery shelf. 4-24 Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
UPS System Installation NOTE The Eaton 9E-40 model has battery strings installed on three shelves. The Eaton 9E–60/40 and Eaton 9E–60/60 models have battery strings installed on four shelves. Repeat Step 3 through Step 5 for each battery shelf (see Figure 4-23) to complete the battery string connections.
Battery Shelf Battery Section Battery Strings NOTE The Eaton 9E-40 model has battery strings installed on three shelves. The Eaton 9E–60/40 and Eaton 9E–60/60 models have battery strings installed on four shelves. Figure 4-23. Battery Section 4-26 Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4...
Eaton Customer Service Engineer, or the warranty terms specified on page W-1 become void. This service is offered as part of the sales contract for the UPS. Contact an Eaton service representative in advance (usually a two-week notice is required) to reserve a preferred startup date.
Page 64
Accessories are mounted in installed locations and wiring is terminated inside the UPS cabinet. (Optional) Air conditioning equipment is installed and operating correctly. The area around the installed UPS system is clean and dust-free. (Eaton recommends that the UPS be installed on a level floor suitable for computer or electronic equipment.) Adequate workspace exists around the UPS and other cabinets.
Page 65
UPS System Installation Notes Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality 4-29...
Page 66
UPS System Installation This page intentionally left blank. 4-30 Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
Understanding UPS Operation UPS System Overview The Eaton 9E UPS is a continuous-duty, solid-state, transformerless, three-phase, true online system that provides conditioned and uninterruptible AC power to the UPS system's output and critical load. The basic system consists of a rectifier, battery converter, inverter, monitoring/operation control panel, integrated communication server, and digital signal processor (DSP) logic.
Page 70
5.2.1 Modes The Eaton 9EUPS supports a critical load in four different modes of operation: In High-Efficiency (HE) Normal mode, commercial AC power is supplied directly to the critical load through the internal bypass and transfers automatically to Standard Normal mode (double-conversion on demand) if an abnormal condition is detected.
If the UPS suffers an internal failure, it switches automatically to Bypass mode and remains in that mode until the failure is corrected and the UPS is back in service. Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
Battery Converter Main Power Flow Battery Breakers Relays Relay Trickle Current Closed Energized Open De-Energized Battery Figure 5-3. Path of Current Through the UPS in Bypass Mode Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
Normal mode. Depending on the total load and the duration of the battery discharge, battery current limit alarms may be seen for a short time due to the current required to recharge the battery. Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
9E-40 208/220 208/220 Single Reverse Transfer UPS with Internal Battery 9E–60/40 9E–60/60 See Figure 5-6 9E-40 208/220 208/220 Single Reverse Transfer UPS with External Battery 9E–60/40 9E–60/60 Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
EXTERNAL BATTERY CABINET NOTE Callout letters A, B, C, and D map to Table 3-4. (Not supplied with the UPS) Figure 5-6. UPS System Oneline – External Battery Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
The controls and indicators identified and described in this section are used to control and monitor UPS operation. Figure 6-1 shows the controls and indicators and Figure 6-2 shows the UPS breakers. Control Panel Door Latch Figure 6-1. UPS Controls and Indicators Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
Maintenance Bypass Breaker – The Maintenance Bypass breaker, as part of the optional maintenance bypass, is used to partially isolate the UPS so that a limited number of components can be serviced without interrupting power to critical systems. Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
The following paragraphs describe using the UPS control panel to monitor the UPS. See paragraph 6.3 for use of the operational controls. When the unit powers up, the screen displays the Eaton logo as shown in Figure 6-3. To advance to the Main Menu and Mimic screen, press any control panel pushbutton once.
Page 80
This message is also written to the Events Log and may be added to the History Log. The messages are divided into four categories: alarms, notices, status, and commands. Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
Page 81
Figure 6-4. Parts of the LCD The UPS status area automatically scrolls between the Eaton model number, current date and time, active alarms, UPS status, load percent, and battery runtime for the UPS. The top line of display blinks while scrolling when the system needs attention.
Eaton Eaton 9E 9E 9E 9E Series Eaton Eaton Series Series UPS Series Figure 6-5. Main Menu and Mimic Screen Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
DOWN arrow pushbutton to highlight the desired format, then press the RETURN pushbutton to display the Set Date and Time screen. To return to the System Setup screen, press the ESC pushbutton. Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
Page 84
LEFT or RIGHT arrow pushbutton to select the password character position. Use the UP or DOWN arrow pushbutton to change the password character. Once the password is entered, select CHANGE and then press the RETURN pushbutton Controls See paragraph 6.2.7 for details. Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
Page 85
Table 6-5 lists the typical System Status Screen Messages that are displayed during UPS operation. For detailed information about using the System Controls, see paragraph 6.3. Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
Turns the battery charger off. Table 6-5. Typical System Status Messages Function Message Load Off; Bypass; Online, HE Bypass Off; On; Available Charger Charger Resting; Charger 6-10 Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
UPS Operating Instructions Single UPS Operation NOTE 1 If an External Battery Cabinet (EBC) is installed, refer to the Eaton 9E External Battery Cabinet Installation Manual listed in paragraph 1.8 for EBC battery breaker location. NOTE 2 If an Integrated Transformer Cabinet (ITC) is installed, refer to the Eaton 9E Integrated Transformer Cabinet Installation Manual listed in paragraph 1.8 for...
Page 88
14. Select the CONTROLS symbol on the main menu bar. The System Control screen is displayed. 15. If not already selected, select UPS on the System Control screen. 6-12 Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
Page 89
The UPS transfers to Normal mode. If the power module is not available, the system remains on bypass and an alarm sounds. The NORMAL status indicator is illuminated. Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality 6-13...
Page 90
Restart the UPS in bypass mode by performing the procedure in paragraph 6.3.2. Verify that the UPS is in bypass mode. Close the UPS output breaker. 6-14 Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
The input and battery relays open. WARNING Power is present inside the UPS cabinet after the upstream input feeder circuit breakers are opened because of the installed internal batteries. Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality 6-15...
UPS mode, then press the RETURN pushbutton. The Verify Action screen is displayed, providing a choice to proceed or abort the shutdown. 6-16 Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
Page 93
CAUTION Do not attempt to restart the system after the REPO until the cause of the shutdown has been identified and cleared. Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality 6-17...
Power is present inside the UPS cabinet after the upstream input feeder circuit breakers are opened because of the installed internal batteries. Activated Deactivated Pushbutton locked into place Unlock pushbutton to release Figure 6-9. REPO Operation 6-18 Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
The paragraphs in this section provide operating instructions for a UPS system containing multiple UPSs. NOTE 1 If an External Battery Cabinet (EBC) is installed, refer to the Eaton 9E External Battery Cabinet Installation Manual listed in paragraph 1.8 for EBC battery breaker location.
The critical load is immediately supplied by the bypass source, in Bypass mode from all UPSs. The BYPASS status indicator is illuminated. 16. If the UPS contains an output breaker, close the output breaker. 6-20 Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
On the UPS System Control screen, select the HE: ENABLE DISABLE command, then press the RETURN pushbutton. All of the UPSs transfer to Standard Normal mode. The NORMAL status indicator is illuminated. Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality 6-21...
Select the CONTROLS symbol on the main menu bar. The System Control screen is displayed. If not already selected, select UPS on the System Control screen. 6-22 Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
Transfer the UPSs to bypass by performing the procedure in paragraph 6.4.3. Perform the LOAD OFF procedure in paragraph 6.4.14. The output and bypass backfeed relays open, and the power module is turned off. Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality 6-23...
Select Battery on the System Control screen. On the Battery System Control screen, select the RESTING TESTING command, then press the RETURN pushbutton. 6-24 Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
To restart the UPS after pressing the LOAD OFF pushbutton, follow the procedure in paragraph 6.4.1 or 6.4.2. WARNING Power is present inside the UPS cabinet after the upstream input feeder circuit breakers are opened because of the installed internal batteries. Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality 6-25...
Page 102
Restart the UPS by following the procedure in paragraph 6.4.1 or 6.4.2. WARNING Power is present inside the UPS cabinet after the upstream input feeder circuit breakers are opened because of the installed internal batteries. 6-26 Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
Chapter 7 Communication This chapter describes the communication features of the Eaton 9E UPS. For terminal wiring information, see paragraph 3.2.3 and paragraph 4.11. For location of the customer interface panel and terminals, see Figure 4-10 and Figure 4-11. Mini-Slot Cards The Eaton 9E UPS has two standard, factory-installed Mini-Slot communication bays.
Page 104
Communication This page intentionally left blank. Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
Each battery string is an energy source in itself. DO NOT ATTEMPT TO ACCESS ANY INTERNAL AREA OF THE BATTERY STRING YOURSELF. VOLTAGES ARE ALWAYS PRESENT IN THE BATTERY STRING. If you suspect that a battery string needs service, contact an Eaton service representative. If the string requires service contact an Eaton service representative.
Monitor system parameters as described in paragraph 6.2, “Using the Control Panel” . Check the UPS air filters (located behind the front door) and wash or replace as necessary. See Figure 8-1 for filter location. Contact an Eaton service representative for replacement filters. To remove the filters: CAUTION Verify washed filter is thoroughly dry before reinstalling.
8.2.3 ANNUAL Maintenance Annual preventive maintenance should be performed only by authorized service personnel familiar with maintenance and servicing of the UPS system. Contact an Eaton service representative for more information about service offerings. 8.2.4 BATTERY Maintenance Contact an Eaton service representative for battery maintenance.
Maintenance Training A basic training course, available from Eaton Corporation, gives you a competent working knowledge of the UPS system operation and teaches you how to perform first level corrective maintenance. For more information about training and other services, contact the Help Desk (see paragraph 1.8).
6 kV OC, 3 kA SC per ANSI 62.41 and IEC 8014 Battery Voltage 216 Vdc Battery Charging Capacity 12A maximum at any load up to100% load Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
Battery Runtimes (in Minutes) at Full load UPS Model Number of Battery Strings Runtime 9E-40 9E–60/40 9E–60/60 NOTE Battery times are approximate and vary depending on the load configuration and battery charge. Eaton 9E UPS (40–60 kVA, 208/220V) Installation and Operation Manual P-164000058—Rev 4 www.eaton.com/powerquality...
For Product installed (and currently located) outside the fifty (50) United States and the District of Columbia, if, in the opinion of Eaton, a Warranted Item is defective, Eaton's sole obligation, at the option of Eaton, will be to refurbish or replace such defective Warranted Item (not including the costs of labor coverage). The defective Warranted Item will be refurbished or replaced onsite at the End-User's location or such other location as determined by Eaton.
Page 112
Eaton shall not be responsible for failure to provide service or parts due to causes beyond Eaton's reasonable control. In no case will Eaton's liability under this Warranty exceed the replacement value of the Warranted Items.
Need help?
Do you have a question about the 9E and is the answer not in the manual?
Questions and answers