ALLIANCE 120 Series Installation, Operation & Maintenance Manual page 52

120, 170, 200 series tumble dryers 54, 77 and 91 kilogram
Table of Contents

Advertisement

Steam Requirements
120 Series Tumble Dryers
11
10
9
NOTE: Refer to Table 13 for sizing of steam lines. Piping must also be sized accordingly for length of runs and
number of elbows.
Supply
1
305 mm (12 in.) Riser
2
Shut-Off Valve
3
Condensate Return Line from Supply Line
4
Return
5
Check Valve
6
Vacuum Breaker (Optional)
7
Steam Pressure bar
(PSI)
5.3-6.9 (80-100)
* Based on maximum bar.
50
1
8
7
6
Supply Pipe Diameter
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
2
12
6
13
457 mm (18 in.) Drop
8
Solenoid Valve (Supplied with machine)
9
Steam Bonnet
10
Flexible Line
11
Union
12
Trap with Built-In Strainer
13
Figure 19
Minimum
1 in. NPT
Table 13
3
4
5
TMB2014N
Steam Trap Size*
Kilograms Condensate/Hour
(Pounds Condensate/Hour)
156 (345)
70458101 (EN)
TMB2014N