ALLIANCE 120 Series Installation, Operation & Maintenance Manual page 22

120, 170, 200 series tumble dryers 54, 77 and 91 kilogram
Table of Contents

Advertisement

Installation
To reduce the risk of severe injury, clearance of tumbler cabinet from combustible
construction must conform to the minimum clearances, and/or local codes and
ordinances.
NOTE: Shaded areas indicate adjacent structure.
1
13 mm (0.5 in.) recommended between machines for removal or installation
2
Allow 51-102 mm (2-4 in.) opening at top of machine to aid in removal or installation. A removable trim piece
may be used to conceal the opening; zero clearance allowed for trim
3
102 mm (4 in.) maximum header thickness
4
Minimum clearance permitted for remainder: Gas and Electric 102 mm (4 in.), Steam 305 mm (12 in.)
5
Guard
6
Provision for make-up air
7
610 mm (24 in.) minimum, 914 mm (36 in.) recommended for maintenance purposes
8
6 mm (0.25 in.) recommended for removal or installation purposes, zero clearance allowed
20
1
8
© Copyright, Alliance Laundry Systems LLC – DO NOT COPY or TRANSMIT
WARNING
3
2
Figure 2
W770
4
5
6
7
TMB2020N
TMB2020N
70458101 (EN)

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

170 series200 seriesCa120lCa120nCk120nCt120l ... Show all

Table of Contents