Chapter 1 Chassis Installation; Environmental And Safety Recommendations - Mellanox Technologies MSX6512-NR Hardware Installation Manual

216 port infiniband fdr switch platform
Hide thumbs Also See for MSX6512-NR:
Table of Contents

Advertisement

216 Port InfiniBand FDR Switch Platform Hardware Installation Guide
1
Chassis Installation
Installation and initialization of the chassis is a simple process requiring attention to the
normal mechanical, power, and thermal precautions for rack-mounted equipment. Your
chassis comes only with the power supplies and fans pre-installed. The rest of the open-
ings are populated with blanks. All of the leafs, spines, and management modules come
shipped in separate packages.
The chassis requires initial configuration to get the chassis and Fabric management up and
running through remote management. see "Configuring the Switch Management Modules
for the First Time" on page 35.
1.1

Environmental and Safety Recommendations

The following are Mellanox recommendations.
Mellanox Technologies
This chassis can be installed in standard 19" racks that have depths between 65cm
(25.6in.) and 80cm (31.5in.) between the vertical supports of the rack.
This unit is intended for installation in a Restricted Access Location. A restricted
access area can be accessed only through the use of a special tool, lock and key, or
other means of security.
Recommended ambient temperature in the System room is 20
Recommended humidity ranges is 40% ± 15% without condensing.
It is highly recommended that the installation sites be as isolated as possible from all
sources of radio transmissions and electrical interference.
It is highly recommended that the installation site building be equipped with a light-
ning rod.
It is highly recommended that the installation site be equipped with smoke detectors
and a fire alarm warning system.
Rev 1.0
o
o
± 5
C.
9

Advertisement

Table of Contents
loading

This manual is also suitable for:

Msx6512-4r

Table of Contents