Installation Overview - Fujitsu SPARC Enterprise T5440 Installation And Setup Manual

Hide thumbs Also See for SPARC Enterprise T5440:
Table of Contents

Advertisement

Installation Overview

This installation guide provides procedures that are to be performed in the following
order.
1. Verify that you have received all of the components that ship with your server.
2. Gather configuration information for your system. See your system administrator
for specific details, including these parameters:
Netmask
IP address for the service processor
Gateway IP address
3. Install any optional components shipped with your system. If you have purchased
other optional components such as additional memory, install them prior to
mounting the server in a rack. See
4. Mount the server into a rack or cabinet. See
on page
14.
Note – In the rest of this manual, the term rack means either an open rack or a closed
cabinet.
5. Connect the server to a serial terminal or a terminal emulator (PC or workstation)
to display system messages. See
page
32.
Caution – The serial terminal or a terminal emulator should be connected before
you connect the power cables. As soon as AC power is connected to the system, the
service processor immediately powers on and runs diagnostics. Diagnostic test
failures will be printed on the serial terminal. For more information, refer to the
Integrated Lights Out Manager 3.0 Supplement for SPARC Enterprise T5440 Server.
6. Connect the data cables to the server, but do not connect the AC power cable yet.
See
"Connecting the Server Cables" on page
7. Connect the AC power cable to the server and examine the display for any error
messages. See
"Powering On the System for the First Time" on page
The service processor runs on the 3.3V standby voltage. As soon as AC power is
connected to the system, the service processor immediately powers on, runs
diagnostics, and initializes the ILOM firmware.
"Optional Component Installation" on page
"Installing the Rack Slide Assembly"
"Powering On the System for the First Time" on
25.
32.
Preparing for Installation
5.
3

Advertisement

Table of Contents
loading

Table of Contents