Parts Needed - Backyard Discovery Montpelier 30211 Owner's Manual

Wooden swing set
Table of Contents

Advertisement

Parts needed:

• (1) G1 - SWING BEAM MOUNT - W101495
• (2) L3 - WALL RAIL - W101489
• (1) M6 - FLOOR RAIL - W101447
• (2) M8 - WALL RAIL - W101454
• (1) K3 - ARCHED WALL BOARD - W101456
• (2) K2 - BASE BOARD - W101452
Phase Notes
• Assemble with hardware as shown.
Note: It is vital that the fort
be level before and after
each phase of assembly.
Step 8: Pre-Drill & attach 'L3' Wall
Rail to 'E3' Tower Legs using Lag
Screws 'Z' and Washers 'AC', as
shown.
AC
Z
Step 7: Pre-Drill &
attach 'K3' Arched
Wall Board to 'E3'
Tower Legs using
Lag Screws 'Z'
and Washers 'AC',
as shown.
Z
AC
Step 6: Pre-Drill &
attach 'M8' Wall
Z
Rails to 'E3'
Tower Legs using
Lag Screws 'Z'
and Washers 'AC',
as shown.
Z
Step 5: Pre-Drill & attach 'K2'
Floor Board to 'E3' Tower Legs
using Lag Screws 'Z' and
Washers 'AC', as shown.
Fort Assembly
E3
L3
AC
AC
M8
K3
M8
AC
K2
AC
Phase 3
Hardware needed:
• (8) BG - T-NUT 5/16 - H100074
• (4) T - BOLT WH 5/16x4 - H100020
• (26) Z - LAG SCREW WH 5/16x2 - H100027
• (30) AC - WASHER LOCK EXT 8X19 - H100030
To prevent board splitting, you
must pre-drill each board with
a 1/8" drill bit, before attaching.
AC
E1
BG
BG
L3
M6
E3
K2
Step 1: Attach 'G1' Swing Beam
Mount to 'E1' & 'E2' Tower Legs
T
using Bolts 'T', Washer 'AC' and
T-Nuts 'BG', as shown.
G1
E2
Z
Step 2: Pre-Drill &
attach 'L3' Wall
Rail to 'E1' & 'E2'
AC
Tower Legs using
Lag Screws 'Z'
and Washers 'AC',
Z
as shown.
Step 3: Pre-Drill &
AC
attach 'M6' Floor
Rail to 'E1' & 'E2'
Tower Legs using
Lag Screws 'Z'
and Washers 'AC',
as shown.
AC
Z
AC
Step 4: Pre-Drill & attach 'K2'
Floor Board to 'E1' & 'E2' Tower
Legs using Lag Screws 'Z' and
Washers 'AC', as shown.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents