Parts needed:
• (1) BENCH ASSEMBLY
Phase Notes
• Assemble with hardware as shown.
B
AD
BENCH ASSEMBLY
Fort Assembly
K2
EJ
Phase 25
Hardware needed:
• (2) B - NUT BARREL 5/16x5/8 - H100004
• (2) AD - WASHER LOCK EXT 12x19 - H100031
• (2) CM - BOLT WH 5/16x1/2 - H100115
Step 1: Attach the Bench Assembly to 'K2'
Base Board using Bolts 'CM', Washer 'AD'
and 'B' Barrel Nut, as shown. Repeat the
same process to complete the assembly
on the opposite side.
CM