Cabling Guidelines
Table 4-4: ATA Cabling Sequence
Step
Channel/Cable
1
ATA/100 RAID
primary controller
2
ATA/100 RAID
secondary
controller
3
ATA/100 RAID
primary controller
4
ATA/100 RAID
secondary
controller
Note: Refer to Chapter 1, "Server Features," for drive bay locations.
4. Secure the next available power connector to the hard drive or ATA device.
4-14
Cable Connector
Device 0
Device 0
Device 1
Device 1
HP ProLiant ML310 Server Setup and Installation Guide
Drive Location
Hard drive bay 2
Media bay 3
Hard drive bay 3
Media bay 4