Supero SUPER P3TDLR User Manual page 86

Hide thumbs Also See for SUPER P3TDLR:
Table of Contents

Advertisement

S
UPER P3TDLR User's Manual
Check
Point
60
62
65
66
7F
80
81
82
83
84
85
86
Description
The DMA page register test passed.
DMA Controller 1 base register test next.
The DMA controller 1 base register test passed.
Performing the DMA controller 2 base register test next.
The DMA controller 2 base register test passed.
Programming DMA controllers 1 and 2 next.
Completed programming DMA controllers 1 and 2.
Initializing the 8259 interrupt controller next.
Extended NMI source enabling is in progress.
The keyboard test has started.
buffer and checking for stuck keys.
keyboard reset command next.
A keyboard reset error or stuck key was found.
the keyboard controller interface test command next.
The
keyboard
Writing the command byte and initializing the circular
buffer next.
The
command
initialization has been completed.
locked key next.
Locked key checking is over.
size mismatch with CMOS RAM data next.
The memory size check is done.
and checking for a password or bypassing WINBIOS
Setup next.
The password was checked.
programming before WINBIOS Setup next.
controller
interface
byte
was
written
Checking for a memory
Performing any required
B-6
Performing the
Clearing the output
Issuing the
Issuing
test
completed.
and
global
Checking for a
Displaying a soft error
data

Advertisement

Table of Contents
loading

Table of Contents