Front View - Powerware 9330 Installation And Operation Manual

10 kva -- 20 kva 25 kva -- 40 kva
Table of Contents

Advertisement

BATTERY
BREAKER CB2
MAINTENANCE BYPASS
SWITCH (MBS)
INPUT
BREAKER CB1
AC INPUT TO UPS
RECTIFIER (CB1)
(DUAL INPUT)
(A, B, C)
AC INPUT TO UPS RECTIFIER
AND BYPASS (TB2)
(SINGLE INPUT)
(A, B, C, N)
SEE
SHEET 2
AC INPUT TO BYPASS
FOR
(TB2)
DETAILS
(DUAL INPUT)
(A, B, C, N)
AC OUTPUT TO
CRITICAL LOAD (TB3)
(A, B, C, N)
REMOTE
BATTERY
INPUT
NOTE: METAL SHIELD COVERING POWER
WIRING TERMINALS AND BATTERY
COMPARTMENT MUST BE REMOVED
TO GAIN ACCESS TO WIRING
TERMINALS.
Powerware 9330 (10 kVA- -40 kVA) Installation and Operation
164201300 REV. G 061502
UPS CABINET POWER TERMINALS

FRONT VIEW

GROUND TERMINALS
DESCRIPTION:
LOCATION OF UPS CABINET TERMINALS
POWERWARE 9330 (10 kVA-- 20 kVA)
DRAWING NO:
164201300---8
REVISION:
F
INTERNAL
BATTERIES
SHEET:
1 of 5
DATE:
111501
A ---41