Front View - Powerware BPIV Installation & Operation Manual

10–15 kva/20–30 kva
Table of Contents

Advertisement

BATTERY
BREAKER CB2
MAINTENANCE BYPASS
SWITCH (MBS)
INPUT
BREAKER CB1
AC INPUT TO UPS
RECTIFIER (CB1)
(DUAL INPUT)
(A, B, C)
AC INPUT TO UPS RECTIFIER
AND BYPASS
(SINGLE INPUT)
(A, B, C)
SEE
SHEET 2
AC INPUT TO BYPASS
FOR
(DUAL INPUT)
DETAILS
(A, B, C)
REMOTE
BATTERY
INPUT
AC OUTPUT TO
CRITICAL LOAD
(A, B, C)
NEUTRAL
NOTE: METAL SHIELD COVERING POWER
WIRING TERMINALS AND BATTERY
COMPARTMENT MUST BE REMOVED
TO GAIN ACCESS TO WIRING
TERMINALS.
Powerware BPIV (10 kVA- -30 kVA) Installation and Operation
164201406 Rev. C 013004
UPS CABINET POWER TERMINALS

FRONT VIEW

GROUND TERMINALS
DESCRIPTION:
LOCATION OF UPS CABINET TERMINALS
POWERWARE BPIV (10 kVA-- 15 kVA)
DRAWING NO:
164201406---8
REVISION: C
INTERNAL
BATTERIES
SHEET:
1 of 5
DATE:
013004
A ---47

Advertisement

Table of Contents
loading

Table of Contents