Installing The Supercap Mounting Bracket - HP Integrity BL860c i2 User's & Service Manual

Server blade
Hide thumbs Also See for Integrity BL860c i2:
Table of Contents

Advertisement

Mezzanine foot
1
Mezzanine post loop
2

Installing the Supercap mounting bracket

1.
Power off the server blade and remove it from the server blade enclosure
server blade for
2.
Remove the access panel
3.
Remove the DIMM baffle
4.
Temporarily remove any mezzanine card installed in slot 2
NOTE:
the mezzanine card blank. If you are installing the P71 1m card in mezzanine slot 1, do so
now following the instructions "Installing the P71 1m Controller Board." If you are not installing
the P71 1m card in mezzanine slot 1, and no other mezzanine card is present in slot 1, then
install the mezzanine card blank at this time.
5.
Clip the mounting bracket onto the mezzanine card or mezzanine card blank.
6.
Press the bracket thumbscrew clip over the thumbscrew closest to the mezzanine post.
7.
Push the remaining bracket foot over the other edge of the mezzanine card or mezzanine
card blank.
CAUTION:
CAUTION:
the power cable to the power connectors.
Cable restraining clips
3
servicing").
("Access panel" (page
("DIMM baffle" (page
Mezzanine slot 1 must contain the P71 1m Controller, another mezzanine card, or
Push only enough to anchor the bracket, keeping the bracket level.
To avoid damage to the power cable ensure the battery bracket does not pinch
C-hook
4
113)).
115))
("Mezzanine cards" (page
Installing internal components
("Preparing the
123)).
63

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Integrity bl890c i2Integrity bl870c i2

Table of Contents