3 Installing the Cable Management Bracket

The location of the c-Class enclosure cable management bracket depends on the rack position
occupied by the HP BladeSystem c-Class enclosure. The InfiniBand switch might be installed in
any or all of the interconnect module bays identified in
The kit occupies less than 1U (1.75 inches) of rack column space.
3.1 Installing the Cable Management Bracket
Use the following procedure to install the HP BladeSystem c-Class enclosure cable management
bracket:
Caution:
When performing the installation procedure, extend only one c-Class enclosure no more than a
few inches from the rack at any time. Ensure that the rack is stable before you begin the installation
procedure.
Note:
One HP BladeSystem c-Class enclosure cable management bracket is required for each InfiniBand
switch installed in the rear of the c-Class enclosure.
1.
Starting from the lowest bracket location, and using the fastener locations that you identified
and marked in
2.
Hook the bracket onto the square cutouts in the rack column.
3.
Fasten the bracket to the rear rack columns by using two M6 pan-head screws and tighten
them to the specified torque.
4.
If more than one bracket is required, repeat Step 1.
5.
Slide the c-Class enclosure back into the rack and secure it at the front of the rack as specified
in the installation instructions for the enclosure.
6.
If necessary, attach the second bracket once the first switch (lowest switch in the c7000
enclosure) is cabled and tie-wrapped.
Note:
HP recommends that you only install the cable management bracket for the lowest InfiniBand
switch in the c-Class enclosure and complete the cable installation. Doing so makes it easier to
install the releasable cable ties for each of the InfiniBand cables. Once the releasable cable ties
are installed for the InfiniBand cables coming from the switch installed in the lowest interconnect
module bay, you must install the next cable management bracket and releasable cable ties for
the next InfiniBand switch. It is necessary to complete the installation for the lowest bracket first
because there is not much room between the brackets to secure the releasable cable ties when
two brackets need to be installed.

3.2 Installing the Releasable Cable Ties for the InfiniBand Cables

Figure 3-1
shows the holes in the bracket that are used in the cable management bracket for an
InfiniBand switch with 16 external uplink ports.
are used for an InfiniBand switch with 8 external uplink ports.
Chapter
2, clip a cage nut into the back of each rear rack column.
Table
2-1.
Figure 3-2
shows the holes in the bracket that
3.1 Installing the Cable Management Bracket