Ich Mezzanine Board; System Board - HP Integrity BL860c i2 User's & Service Manual

Server blade
Hide thumbs Also See for Integrity BL860c i2:
Table of Contents

Advertisement

ICH mezzanine board

The ICH mezzanine card houses the following components:
Intel ICH10 South Bridge
ATI/AMD RN50/ES1000 Video Controller
Embedded TPM 1.2
Internal USB port — NOT SUPPORTED FOR USE
One ICH mezzanine board is required per system. The ICH mezzanine board is required in the
BL860c i2. In the BL870c i2 and BL890c i2, the ICH mezzanine board is only required in the
Monarch blade.
1.
Power off the server and remove it from the enclosure
servicing").
2.
Remove the access panel
3.
Remove the ICH mezzanine card:
To replace the component, reverse the removal procedure.

System board

CAUTION:
server blade.
In the event of a system board failure, both the system board and the server blade are replaced.
Before sending in the system board and server blade for replacement, remove the following
components:
The processor and heatsink module
The processor air baffle
The DIMMs
The DIMM baffle
The Smart Array battery
The Mezzanine cards
124 Removing and replacing components
("Access panel" (page
To prevent damage to the system board, do not remove the system board from the
(" CPU baffle" (page
("DIMMs" (page
116))
("DIMM baffle" (page
("Removing the BBWC battery" (page
("Mezzanine cards" (page
("Preparing the server blade for
113)).
(" CPU and heatsink module" (page
117))
115))
123))
118))
61))

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Integrity bl890c i2Integrity bl870c i2

Table of Contents