3.
Install the server blade.
The server blade should come up to standby power. The server blade is at standby power if the
blade power LED is amber.
Server blade power states
The server blade has three power states: standby power, full power, and off. Install the server
blade into the enclosure to achieve the standby power state. Server blades are set to power on to
standby power when installed in a server blade enclosure. Verify the power state by viewing the
LEDs on the front panel, and using
Table
5.
For more front panel LED information, see
"Front panel LEDs" (page
93).
Installing and powering on the server blade
21
Need help?
Do you have a question about the Integrity BL860c i2 and is the answer not in the manual?
Questions and answers