Hardware Installation; Installation Steps - Fujitsu Siemens Computers PRIMERGY TX150 Operating Manual

Server system
Table of Contents

Advertisement

4

Hardware Installation

V
CAUTION!
Please note the safety instructions in chapter "Important Notes" on
page 11.
Do not expose the server to extreme environmental conditions (see section
"Technical Data" on page 6). Protect it from dust, moisture, and heat.
The server must be acclimatized in its operating environment for an accli-
matization time.
Temperature difference (°C)
(operating environment/outside)
10
15
20
25
30
Table 2: Acclimatization time
4.1

Installation Steps

The following installation steps are described in detail in other sections of this
chapter:
Ê Unpacking the server (see next section "Unpacking the Server").
Ê Setting up the floorstand model (see section "Setting Up the Floorstand
Model" on page 25) or mounting the rack model into the rack (see section
"Installing/Removing the Rack Model" on page 28) as shown in the layout
arrangement created with System Architect.
Ê Cabling the server. Please also refer to the technical manual for the corre-
sponding rack, the section "Connecting Devices to the Server" on page 47
and section "Instructions on Connecting/ Disconnecting Cables" on page 51.
Ê Connect the server to the power supply (see section "Connecting the Server
to the Line Voltage" on page 49).
A26361-K879-Z102-3-7619
5
Minimum acclimatization time
(hours)
3
5
7
8
9
10
23

Advertisement

Table of Contents
loading

Table of Contents