Installing Bulk Load Mailbox - ADIC Scalar 100 User Manual

Intelligent storage
Hide thumbs Also See for Scalar 100:
Table of Contents

Advertisement

To install a secondary power supply
1
On the rear of the library, find the secondary power supply slot. Loosen the two thumbscrews on the
cover plate and remove the cover plate.
WARNING
2
Slide the power supply into position until it mates with the power distribution PCBA and tighten the two
captive thumbscrews.

Installing Bulk Load Mailbox

To install a bulk load Mailbox you must first remove the standard Mailbox.
Tools required:
T20 Torx driver
#2 Phillips screw driver
#2 and 11/32 nut driver
38
LIVE AC VOLTAGE IS PRESENT ON THE DC POWER SUPPLY
CONNECTOR AT THE REAR OF THE COMPARTMENT. EXERCISE
EXTREME CARE WHEN WORKING IN OR NEAR THE DC POWER
SUPPLY COMPARTMENT.
Installing and Removing Hardware

Advertisement

Table of Contents
loading

Table of Contents