UPS-MOUNTED BYPASS SWITCH INSTALLATION
30
EATON Powerware
NOTE Input neutral must be wired for proper operation. Failure to connect an input neutral will void the
warranty. However, when wired with the optional isolation transformer, input neutral is supplied by the
isolation transformer.
Table 4. MBM/PDM Terminal Block (TB10) Wiring
Wire Function
Input
p
Ground
L1
Neutral
L2
Output
p
L1
Neutral
L2
Ground
* Use only 75°C-rated copper wire. Minimum wire size is based on 120/208 full load ratings applied to
NEC Code Table 310-16. Code may require a larger AWG size than shown in this table because of
temperature, number of conductors in the conduit, or long service runs. Follow local requirements.
8.
Connect the factory-installed wiring from the maintenance bypass switch to the
UPS terminal block (see Figure 20).
Connect the maintenance bypass (red and black) wires to TB1-2 (the A/B
maintenance bypass auxiliary contacts) on the UPS terminal block.
A/B Maintenance
Bypass Auxiliary
Contacts
®
9155 UPS (8–15 kVA) User's Guide
Input Circuit
Minimum
Breaker Rating
Wire Size*
8 AWG
8 kVA
60A
4 AWG (21.2 mm
10 kVA
80A
3 AWG (26.7 mm
G (
12 kVA
12 kVA
100A
100A
2 AWG (33 6 mm
2 AWG (33.6 mm
15 kVA
100A
2 AWG (33.6 mm
3 AWG
3 AWG
3 AWG
8 AWG
Input
TB1
1
2
2A
3
Figure 20. Wiring from Maintenance Bypass Switch to UPS
S
164201553 Rev F www.powerware.com
Tightening
Conduit Connection
Torque
(Entry Size)
2
)
120 lb in
120 lb in
2 access hole for
2" access hole for
2
2
)
)
(13.5 Nm)
1-1/2" conduit
2
2
)
)
2
)
120 lb in
120 lb in
2 access hole for
2" access hole for
(13.5 Nm)
1-1/2" conduit
Output
4
5
6
7
8
8A
9