Connecting the Cables
Turning the Library ON and Configuring Network
Settings
Quantum Scalar i40 and Scalar i80 User's Guide
Follow the instructions for connecting the cables in
Cables
on page 173.
Caution: Before turning the library on, make sure you removed the
shipping restraint (4 thumbscrews, mylar sheet, metal clip)
from the top of the library! Otherwise, the library will not
initialize. See
1 Turn the library ON by pressing the power button on the front bezel
(see
Figure
9).
• The green power LED on the front panel above the power
button illuminates, and the LCD screen turns on. The library
goes through a connection and initialization sequence. This can
take 5 to 17 minutes, depending on the size of your library.
• The status LED on the rear of each drive sled turns green during
initialization.
Chapter 2: Initial Installation and Setup
Figure 8
on page 17.
Connecting the Cables
Connecting Library
19