Fujitsu PRIMERGY RX600 S3 Operating Manual page 97

Hide thumbs Also See for PRIMERGY RX600 S3:
Table of Contents

Advertisement

Hot-plug Components
V
CAUTION!
Make sure that the connections on the PCI board are not blocked by
snap-fits.
Ê Proceed in the same way using other snap-fits.
Commissioning a PCI Board
Ê Insert the PCI board attached to the pull-out aid in the PCI slot.
Ê Lock the PCI board (see
back into the casing until it engages.
Ê If present, connect the cables of the new PCI board.
Ê Press the attention button (1, see
The attention LED and the power LED flash orange.
The slot is in the enable sequence.
Ê Wait until the attention LED and the power indicator light green.
The slot is now powered on.
I
If the attention LED keeps flashing, an error has occurred.
Ê Remove the PCI board and repeat the procedure.
Ê Close the cover again (see
U41662-J-Z156-1-76
figure 33 on page
figure 32 on page
"Opening/Closing the Casing" on page
91) by pushing the green latch
90).
PCI boards
98).
97

Advertisement

Table of Contents
loading

Table of Contents