0051 Battery health check started

0052 Battery health check completed

0053 Battery capacity test is overdue

0055 Battery charging started

www.3ware.com
Event Type
Information
Cause
The Battery Backup Unit periodically evaluates the health of the battery and
its ability to backup the 3ware RAID controller in case of a power failure.
This health check has started.
Event Type
Information
Cause
The Battery Backup Unit evaluates periodically the health of the battery and
its ability to backup the 3ware RAID controller in case of a power failure.
This message is posted to the host when this health check has completed.
Event Type
Information
Cause
There has not been a battery capacity test run in the last 6 months, which is the
maximum recommended interval. This message will be sent once every week
until the test is run.
Action
AMCC recommends running the test at least once every 6 months, if the
measured battery capacity is longer than 120 hours. If the measured battery
capacity is less than 120 hours the recommended test interval is 4 weeks.
Event Type
Information
Error and Notification Messages