Installation Instructions; Introduction; Initial Inspection; Operator Safety Instructions - Fluke PM2811 User Manual

Programmable power supplies
Table of Contents

Advertisement

Installation Instructions

3 INSTALLATION INSTRUCTIONS

3.1 INTRODUCTION

This section contains instructions for the following:
inspecting the contents of the shipment for completeness and/or damage
during transport (initial inspection)
ensuring the safety of the operator
installing the power supply
making the input and output connections
performing the installation acceptance checks

3.2 INITIAL INSPECTION

Inspect the contents of the shipment for completeness and note whether any
damage has occurred during transport. If the contents are not complete, or if there
is damage, inform your FLUKE Sales and Service Center so that repair or
replacement of the instrument can be arranged.
Pay special attention to the following parts :
accessories to be supplied (refer to Appendix A).
front panel keys and display.
rear panel connectors and terminal blocks.
cabinet surfaces.
The shipment must contain one power supply plus the accessories supplied. For
a complete list of accessories supplied, refer to the INITIAL INSPECTION page
in the front of this manual.

3.3 OPERATOR SAFETY INSTRUCTIONS

The instrument has been designed and tested in accordance with IEC Publication
1010 for Class 1 instruments and has been supplied in a safe condition. This
Operation Manual contains WARNING and CAUTION statements, that must be
followed by the user to ensure safe operation and to keep the instrument in a safe
condition.
3 - 1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Pm2812Pm2813Pm2831Pm2832

Table of Contents