Gas Connections - Dean 24G Series Installation & Operation Manual

24g series flatbottom gas fryers
Table of Contents

Advertisement

3.3 Leveling the Fryer (cont.)
NOTE: The installation must be inspected after it is complete to ensure it meets the intent of
these instructions. The on-site supervisor and/or operator(s) should be informed that the
appliance is installed with restraints. If restraints are removed to move fryer (cleaning
beneath and behind, relocation, etc.), ensure that they are re-installed when fryer is returned
to its permanently installed position.
The fryer MUST
MUST
MUST be connected to the gas supply specified on the rating and serial number
MUST
If gas odors are detected, the gas supply MUST
local gas company or FASC should be contacted immediately to rectify the problem.

3.4 Gas Connections

CE REQUIREMENTS
Dean 24G Series Flatbottom gas fryers have obtained CE markings for countries and gas categories
shown below:
COUNTRIES
UNITED KINGDOM (GB)
LUXEMBOURG (LU)
NETHERLANDS (NL)
24G SERIES FLATBOTTOM GAS FRYERS
CHAPTER 3: INSTALLATION INSTRUCTIONS
plate located on the back of the fryer door.
CATEGORIES
GERMANY (DE)
II2ELL3B/P
I3P
AUSTRIA (AT)
II2H3B/P
I2E(R)B
BELGIUM (BE)
I3+
DENMARK (DK)
FINLAND (FI)
II2H3B/P
SWEDEN (SE)
SPAIN (ES)
GREECE (GR)
ITALY (IT)
II2H3+
IRELAND (IE)
PORTUGAL (PT)
SPAIN (ES)
II2H3P
II2Esi3+
FRANCE (FR)
II2Esi3P
II2E3B/P
II2L3P
II2L3B/P
DANGER
WARNING
MUST be shut off at the main shut-off valve. The
MUST
MUST
GAS
G20/G25; G30/G31
G31
G20; G30/G31
G20/G25
G30/G31
G20; G30/G31
G20; G30/G31
G20; G31
G20/G25; G30/G31
G20/G25; G31
G20; G30/G31
G25; G31
G25; G30/G31
3-4
PRESSURE (MBAR)
20
50
50
20
50
20/25
28-30/37
20
30
20
28-30/37
20
37 AND 50
20/25
28-30/37
20/25
50
20
50
25
50
25
30

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

1824g2424g1824

Table of Contents

Save PDF