Gas Connections - Dean SM20 Installation & Operation Manual

Gas fryers
Table of Contents

Advertisement

3.3 Leveling the Fryer (cont.)
NOTE: The installation must be inspected after it is complete to ensure it meets the intent of
these instructions. The on-site supervisor and/or operator(s) should be informed that the
appliance is installed with restraints. If restraints are removed to move fryer (cleaning
beneath and behind, relocation, etc.), ensure that they are re-installed when fryer is returned
to its permanently installed position.
The fryer MUST be connected to the gas supply specified on the rating and serial number
If gas odors are detected, the gas supply MUST be shut off at the main shut-off valve. The
local gas company or FASC should be contacted immediately to rectify the problem.

3.4 Gas Connections

Dean Super Marathon and Super Runner Series gas fryers have obtained CE markings for countries
and gas categories shown below:
Countries
BE
Belgium
DE
Germany
DK
Denmark
ES
Spain
FR
France
GB
Great Britain
GR
Greece
IR
Ireland
IT
Italy
LU
Luxembourg
NL
The Netherlands
PT
Portugal
DEAN MILLIVOLT GAS FRYERS (CE)
CHAPTER 3: INSTALLATION INSTRUCTIONS
plate located on the back of the fryer door.
Supply Pressures and Gas
(mbar)
G20
G31
G20
G31
G20
G20
G31
G20/G25
G31
G20
G31
G20
G31
G20
G31
G20
G20/G25
G31
G25
G31
G20
G31
CAUTION
WARNING
Appliance Categories
20/25
IIE(R)B3P
37
20
I2E
50
I3P
20
I2H
20
II2H3P
37 and 50
20/25
II2ESI3P
37 and 50
20
II2H3P
37
20
II2H3P
37 and 50
20
II2H3P
37
20
I2H
20/25
II2E3P
50
25
II2L3P
50
20
II2H3P
37
3-4

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sm40Sm50Sm60Sm80Sm35Sr42 ... Show all

Table of Contents