3.5 Gas Connections

Before connecting new pipe to this appliance the pipe must be blown out thoroughly
to remove all foreign material. Foreign material in the burner and gas controls will
A. The gas supply (service) line must be the same size or greater than the fryer inlet line. This fryer
is equipped with a 22 mm (3/4") male inlet. The gas supply line must be sized to accommodate
all the gas-fired equipment that may be connected to that gas supply. Consult your contractor,
gas company, supplier, or other knowledgeable authorities.
Gas Types
G20 and G25
G31
(*) When exceeding 6 meters (18 feet) for a configuration of more than four fryers, it is necessary
to provide a 35 mm (1-1/4") rigid gas connection.
All connections must be sealed with a joint compound suitable for the gas being
used and all connections must be tested with a solution of soapy water before
Never use matches, candles, or any other ignition source to check for leaks. If gas
odors are detected, shut off the gas supply to the appliance at the main shut-off
valve and immediately contact the local gas company or an authorized service
"Dry-firing" your unit will cause damage to the frypot and can cause a fire. Always
ensure that melted shortening, cooking oil or water is in the frypot before firing the
B. Rigid Connections: Check any installer-supplied intake pipe(s) visually and clean threading
chips, or any other foreign matter before installing into a service line. If the intake pipes are not
clear of all foreign matter, the orifices will clog when gas pressure is applied. Seal pipe joints
with a sealant resistive to G31 gas. When using thread compound on gas piping, use very small
amounts and only on male threads. Use a pipe thread compound that is not affected by the
chemical action of G31 gases. DO NOT apply thread compound to the first two pipe threads—
doing so will cause clogging of the burner orifices and control valve.
DECATHLON SERIES GAS FRYERS (CE)
CHAPTER 3: INSTALLATION
DANGER
cause improper and dangerous operation.
Recommended Gas Supply Line Sizes
1
22 mm (3/4")
15 mm (1/2")
DANGER
lighting any pilots.
agency for service.
DANGER
unit.
Number of Fryers
2 to 3
28 mm (1")
22 mm (3/4")
3-4
4 or more (*)
35 mm (1-1/4")
28 mm (1")