Installing The Jacks At The Control Unit Location; Fastening The Cable(S) - AT&T MERLIN 410 Service Manual

Hide thumbs Also See for MERLIN 410:
Table of Contents

Advertisement

Installing the Jacks at the Control Unit Location

1. Get two customer-installable jacks and packages of mounting hardware from
your shipment. Figure 15 shows what you will need.
2. Put one of the jacks at the voice terminal location and one at the control unit location.
3. At the control unit location, wire and fasten the jack following the instructions pack-
aged with it.
Do not fasten cable to the wall or baseboard at this time.
Note:
4. Wire and fasten the other jacks at the control unit location for all voice terminals
being installed.

Fastening the Cable(s)

1. Decide how you are going to fasten the cable.
Staples
Adhesive-backed cable clips.
2. Starting near the control unit jacks, and working toward the voice terminals, fasten the
cables following the instructions applicable to the type of fastener you are using. If
you are using adhesive-backed cable clips, you will achieve a neater appearance if you
run the cables closely together in the same direction. See Figure 16.
CENTER CAPTIVE
SCREW
103A CUSTOMER–INSTALLABLE JACK
Figure 15
Installation (cont'd)
MOUNTING
SCREW
25

Advertisement

Table of Contents
loading

This manual is also suitable for:

Merlin 206

Table of Contents