3. Installation Guidelines
B
B
C
Image 3-27
Mounting the security hook (detail)
How to open a secured rigging point?
1. Push the ring (A) of the first projector downwards and hold it in that position.
B
A
Image 3-28
Opening the rigging sockets
2. Turn the locked part (B) of the second projector a quarter counter clockwise and move it upwards.
R5976654 SLM R12+ 27/01/2005
29