Rigging Points And Accessories - Barco SLM R12 Owner's Manual

Hide thumbs Also See for SLM R12:
Table of Contents

Advertisement

3. Installation Guidelines

3.10 Rigging points and Accessories

Clamps
Slots are made in the carry handle frame for easy inserting the overlockers and for easy adjusting the clamps position so that this
position matches with the rigging points.
Consult a professional structural engineer prior to suspending the ceiling mount from a structure not intended for that use. Always
ensure the working load limit of the structure supporting the projector.
Image 3-29
Mounting the clamps
W
ARNING
How to mount the clamps?
To fix the clamps to the U-profile, follow the next procedure :
1. Measure the distance, center tube as reference, between the two used support bars of a truss.
2. Slide the clamps holders (2 per profile) on its place in the U-profile according the measured distance and secure this position.
Image 3-31
Mounting the clamp — detail
3. Turn the overlockers in the holes of the clamp holder.
The overlocker can turn around.
How to mount the Overlockers to the truss?
To mount the overlocker to the truss, handle as follow :
1. Open the fixation handle.
30
:
When mounting the projector to the ceiling or to a rigging system, always mount security chains.
Image 3-30
Mounting the clamps
R5976654 SLM R12+ 27/01/2005

Advertisement

Table of Contents
loading

This manual is also suitable for:

Slm r12+

Table of Contents