Fujitsu BX630 - PRIMERGY - S2 Dual Operating Manual page 37

Scalable server blade
Hide thumbs Also See for BX630 - PRIMERGY - S2 Dual:
Table of Contents

Advertisement

Installation and Operation
Ê Connect the monitor, keyboard and mouse to the KVM blade on the rear of
the basic unit. For information see the BX600 S2 or BX600 S3 basic unit
operating manual.
Ê Press the KVM button (position 4 in
of the server blade to switch the keyboard, mouse and the monitor of the
KVM blade to the server blade.
Preparing the Software
Booting from the CD-ROM drive
Boot the relevant server blade from the ServerView Installation Manager CD to
install the operating system. In some cases this may require that you change a
few settings:
Ê Insert the ServerView Installation Manager CD in the CD-ROM drive and press
the On/Off button (position 2 in
the server blade.
Ê Press the KVM button (position 4 in
of the server blade to switch the keyboard, mouse and the monitor of the
KVM blade to the server blade. Wait a few seconds for the monitor to be
activated.
Ê When prompted, press [F2] to call up the BIOS setup of the server blade.
Ê In the BIOS setup menu select the Boot submenu and enable Boot from CD-
ROM Drive.
Ê Press [ESC] twice and select Exit Saving Changes from the Exit menu.
Once the server blade has booted from the ServerView Installation Manager CD,
the startup screen is displayed.
BX630 S2
figure 7 on page
figure 7 on page
figure 7 on page
Operating Manual
Configuring the Server Blade
32) on the control panel
32) on the control panel of
32) on the control panel
37

Advertisement

Table of Contents
loading

Table of Contents