DAELIM S2-250 Service Manual page 179

Table of Contents

Advertisement

IGNITION SYSTEM
(+)
L/Y
(-)
L/Y
B/Y
11~22M
G/GR
G/W
67~125K
B/W
11~22M
G/B
V/R
36~67K
V/B
110~200K
V/G
36~67K
G
36~67K
17-4
B/Y
G/R
G/W
67~125K
11~22M
0.5~2K
11~22M
36~67K
110~200K
36~67K
36~67K
A.C. GENERATOR INSPECTION
EXCITER/PUISE COIL INSPECTION
● Remove the luggage box.
● Disconnect the A.C. generator connector.
● Measure the exciter coil resistance between the
black/white wire terminal and ground.
·Black/white~Ground
● Disconnect the pulser coil wire coupler.
● Measure the pulser coil resistance between the
blue/white and green/white wire terminals.
·Black/white~Green/white
IGNITION UNIT
INSPECTION
● Measure the resistance between terminals.
B/W
G/B
V/R
V/B
B/W
G/B
V/R
36~67K
0.5~2K
11~22M
36~67K
11~22M
72~133K
2~5K
2~5K
23~35 ㏀
50~170 ㏀
G
L/Y
G/GR
V/G
G/W
B/Y
Unit : Ω
V/B
V/G
G
110~200K
36~67K
36~67K
11~22M
11~22M
11~22M
110~200K
36~67K
36~67K
11~22M
11~22M
11~22M
72~133K
2~5K
2~5K
72~133K
72~133K
72~133K
0.1~1
72~133K
0.1~1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Sq250S2 250

Table of Contents