Chapter 3 Hardware Installation; Figure 3-1 Installation Procedure - H3C SECPATH F1000-S,SECPATH F1000-S HOST Installation Manual

Table of Contents

Advertisement

Installation Manual
H3C SecPath F1000-S Firewall

Chapter 3 Hardware Installation

3.1 Installation Procedure
Install the cabinet (optional)
Install the device at the
specified place
Connect the grounding wires
Connect the power cord
Connect the console
terminal to device
Verify the installation
Power up the device
Power down the device and
remove the power cord
Install MIM (optional)
Connect the Ethernet
Verify the installation
Connect the power cord
/power up the device

Figure 3-1 Installation procedure

Start
NO
Normal?
YES
interface
End
Troubleshooting
Power down the
device
3-1
Chapter 3 Hardware Installation

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the H3C SECPATH F1000-S,SECPATH F1000-S HOST and is the answer not in the manual?

Table of Contents