8.4 Basic Job Information
Table 14: Basic Job Information
Customer
Project number
Start date (mm/dd/yy)
End date (mm/dd/yy)
Company personnel
End customer
Table 15: Motor Nameplate Data
Motor Nominal Voltage (V AC)
Motor Nominal Frequency (Hz)
Motor Nominal Speed (RPM)
Motor Nominal Current (A AC)
Motor Power Factor (0–1)
Motor Nominal Power (kW)
Transformer Specifications (MVA, Secondary V RMS, %Z)
8.5 Before Power-up Checklist
Table 16: Checklist of Commissioning Tasks to Do Before Power-up
Item
Perform system lockout/tagout and grounding of the drive
according to the specific customer installation procedure.
Confirm that the ambient conditions are within the specifi-
cation.
See
11.1 Technical
Data.
Check that the input power of the drive meets the drive
specification.
Check that the output voltage of the drive matches the
rated voltage of the motor.
Check that the control power supply matches the drive
specification.
Check that the rated power of the drive matches the mo-
tor specification.
Check that there is no damage, deformation, or other de-
fects on the cabinet.
Make sure that the mains and motor cables are selected
according to the requirements.
See
6.7 Power Cable
Selection.
98
| Danfoss A/S © 2024.12
Country
Location
Customer ID
Drive serial number
Drive type code
Application
Comments
Date completed
Employee
(dd/mm/yyyy)
AQ363633621020en-000401 / 172F3117D