7
T
L
ILT
OGGER
Installation and orientation for the Affinity Tilt Logger will depend on the specific
project requirements. Please refer to the corresponding section and follow the
outlined instructions for an effective setup.
CAUTION: Please ensure that only the provided antenna is used for installation.
Using a third-party antenna may damage the equipment and/or affect readings.
7.1
I
NSTALLATION
Ensure the logger is clean and operational.
NOTE: Ensure the Tilt Logger is powered up, configured, and claimed to the
project site before proceeding with the physical installation.
1. Powering on: Section 6.1
2. Logger configuration: Section 6.2
3. Claiming logger to project site: Section 6.2.2
7.2
I
NSTALLATION
•
•
•
•
•
•
•
PSM0005A
Released: 23 Jan 2025
U
I
NIT
NSTALLATION
P
REREQUISITES
P
RECAUTIONS
Ensure the mounting surface or structure is suitable for the tilt logger.
Ensure that the concrete material can be suitably drilled and anchors
installed without risk of cracking.
If installing on a horizontal surface, choose a surface that is flat and
stable.
If installing on a vertical surface, verify that the structure can support the
logger and that there is no risk of the logger detaching.
Avoid direct sunlight to minimize its effect on temperature readings. Use
a sunshade if required.
Ensure a clear line of sight to the gateway to enhance battery
performance.
Install the tilt logger with the RSTAR logo or writing legible and right side
up, as this orientation ensures the best calibration accuracy, particularly
concerning temperature calibration.
RST Instruments Ltd.
RSTAR Affinity Tilt Logger
Installation and User Manual
Page 21
Need help?
Do you have a question about the RSTAR Affinity and is the answer not in the manual?