Discovery Through Different Vlans; Discovery Through Different Management Vlans - Cisco WS-C3560-48PS-S Software Configuration Manual

Software configuration guide
Hide thumbs Also See for WS-C3560-48PS-S:
Table of Contents

Advertisement

Chapter 5
Clustering Switches

Discovery Through Different VLANs

If the cluster command switch is a Catalyst 2970, Catalyst 3550, Catalyst 3560, or Catalyst 3750 switch,
the cluster can have cluster member switches in different VLANs. As cluster member switches, they
must be connected through at least one VLAN in common with the cluster command switch. The cluster
command switch in
switches in those VLANs. It does not discover the switch in VLAN 50. It also does not discover the
switch in VLAN 16 in the first column because the cluster command switch has no VLAN connectivity
to it.
Catalyst 2900 XL, Catalyst 2950, and Catalyst 3500 XL cluster member switches must be connected to
the cluster command switch through their management VLAN. For information about discovery through
management VLANs, the
more information about VLANs, see
Figure 5-3
Command switch

Discovery Through Different Management VLANs

Catalyst 2970, Catalyst 3550, Catalyst 3560, or Catalyst 3750 cluster command switches can discover
and manage cluster member switches in different VLANs and different management VLANs. As cluster
member switches, they must be connected through at least one VLAN in common with the cluster
command switch. They do not need to be connected to the cluster command switch through their
management VLAN. The default management VLAN is VLAN 1.
Note
If the switch cluster has a Catalyst 3750 switch or switch stack, that switch or switch stack must be the
cluster command switch.
78-16156-01
Figure 5-3
has ports assigned to VLANs 9, 16, and 62 and therefore discovers the
"Discovery Through Different Management VLANs" section on page
Discovery Through Different VLANs
VLAN 62
VLAN trunk 9,16
VLAN 50
VLAN 62
VLAN trunk 9,16
VLAN 16
VLAN trunk 4,16
Chapter 12, "Configuring VLANs."
Catalyst 3560 Switch Software Configuration Guide
Planning a Switch Cluster
5-7. For
5-7

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents