9. OPERATION
9-1. Operation Sequence
Parameter switch setting
Set the parameter switch on the rear face of the converter.
Mounting the converter
Mounting the converter on the control cabinet.
Connect with external device
Connect ABSOCODER sensor and control device to the
converter.
Power supply connection
Connect the converter to the power supply.
Zero point setting
Designate the zero point setting.
SSI communication protocol
Set the communication protocol.
Test run
Check the operation and position data that can be read out
correctly.
Operation
Execute operation.
START
END
36
-------- Refer to section 8-2.
-------- Refer to section 6-1.
-------- Refer to section 6-2, 7-1.
-------- Refer to section 7-2.
-------- Refer to section 8-2, 9-5.
-------- Refer to section 9-2.
Need help?
Do you have a question about the ABSOCODER NCV-220HSSILC and is the answer not in the manual?