Step 7 Starting Measurements - Omron Z550 Operation Manual

Multi-dimensional sensor
Hide thumbs Also See for Z550:
Table of Contents

Advertisement

7
Starting Measurements
Step
Perform the measurement under the conditions that have been set previously.
The measurement is made under the conditions specified for the displayed scene and the measurement
results are output to the external device connected.
1.
Select [Run].
The measurements are executed continuously, and the
results are displayed.
2.
Move the cursor to [OUT 0
3.
Press the ENT Key.
The selections appear.
4.
Select [OUT1] for which [Step: 2 pts] is set.
The measurement result of OUT1 is displayed.
Check that measurement is being performed correctly.
To switch to the Profile Monitor, Trend Monitor, Digital Monitor or Image Monitor screen, press the
SHIFT Key and Left/Right key.
].
Basic Operations
Scn 0
Run
Set
Run
Tools
System
Save
Scn 0
Run
NEAR
FAR
Zero's OFF
OUT 0
+005.188000
mm
S+ / :Display S+ENT:Adjust
Scn 0
Run
NEAR
OUT0
OUT1
OUT2
OUT3
OUT4
FAR
OUT5
OUT 0
OUT6
OUT7
SECTION 2
99.60ms
Sen0
[ 15]
LV
[ 170]
PEAK
Sen1
[
]
LV
[
]
PEAK
PASS
99.60ms
Sen0
[
]
LV
[
]
PEAK
Sen1
[
]
[
]
Z550
43
Operation Manual

Advertisement

Table of Contents
loading

Table of Contents