Application Precautions - Omron CJ - 09-2009 Operation Manual

Programmable controllers
Table of Contents

Advertisement

Application Precautions

!Caution The operating environment of the PLC System can have a large effect on the
5
Application Precautions
!WARNING
!Caution Failure to abide by the following precautions could lead to faulty operation of
• Locations subject to static electricity or other forms of noise.
• Locations subject to strong electromagnetic fields.
• Locations subject to possible exposure to radioactivity.
• Locations close to power supplies.
longevity and reliability of the system. Improper operating environments can
lead to malfunction, failure, and other unforeseeable problems with the PLC
System. Be sure that the operating environment is within the specified condi-
tions at installation and remains within the specified conditions during the life
of the system.
Observe the following precautions when using the PLC System.
• You must use the CX-Programmer (programming software that runs on
Windows) if you need to program more than one task. A Programming
Console can be used to program only one cyclic task plus interrupt tasks.
A Programming Console can, however, be used to edit multitask pro-
grams originally created with the CX-Programmer.
Always heed these precautions. Failure to abide by the following precautions
could lead to serious or possibly fatal injury.
• Always connect to a ground of 100 Ω or less when installing the Units. Not
connecting to a ground of 100 Ω or less may result in electric shock.
• A ground of 100 Ω or less must be installed when shorting the GR and LG
terminals on the Power Supply Unit.
• Always turn OFF the power supply to the PLC before attempting any of
the following. Not turning OFF the power supply may result in malfunction
or electric shock.
• Mounting or dismounting Power Supply Units, I/O Units, CPU Units, or
any other Units.
• Assembling the Units.
• Setting DIP switches or rotary switches.
• Connecting cables or wiring the system.
• Connecting or disconnecting the connectors.
the PLC or the system, or could damage the PLC or PLC Units. Always heed
these precautions.
• A CJ-series CPU Unit is shipped with the battery installed and the time
already set on the internal clock. It is not necessary to clear memory or
set the clock before application, as it is for the CS-series CPU Units.
• The user program and parameter area data in CJ1-H/CJ1M CPU Units is
backed up in the internal flash memory. The BKUP indicator will light on
the front of the CPU Unit when the backup operation is in progress. Do
not turn OFF the power supply to the CPU Unit when the BKUP indicator
is lit. The data will not be backed up if power is turned OFF.
5
xli

Advertisement

Table of Contents
loading

Table of Contents