Main Burner Installation; Burner Setup - Wayne LC2300M Manual

Table of Contents

Advertisement

G. MAIN BURNER INSTALLATION
The LC2300M power gas burners are approved for use with natural and LP gas only.
G.1 GENERAL INSTRUCTION
Installation must be completed in accordance with current instructions. The installer must be familiar
with all regulations, so the installation meets the necessary requirements of the local authorities.
Installation, assembly, and set up must be performed to obtain optimal function. Only gas intended for
the burner may be used.
G.2 INSPECTION AND PREPARATION
It is the installer's responsibility to instruct the end user about the functions of the burner and the entire
system. The system must be maintained following the timeline specified by the service schedule found
in SECTION IV - SERVICE. If the burner is in an unclean environment, cleaning and service should be
done on a more frequent schedule. Check that the overall burner size and capacity meet that of the
intended application.
G.3 GAS AND ELECTRIC CONNECTION
To maintain operational safety, there are a few points that must be considered. The burner and its
components must also be approved for the specified gas pressure. All installations for the burner must be
carried out in accordance with current standards. All gas lines should be installed so that any routine
service and maintenance can be easily performed on both the burner and the intended application.
Before installation, all electrical connections must be disconnected. This allows the burner installation to
be electronically isolated. Connections must be made according to current regulations. Electrical
connections must conform to the wiring diagram provided.
H. BURNER SETUP
(Siemens VGD 1" Double Valve Body with SKP15 and SKP25 Regulators)
Firing
Combustion
Rate
Air Shutter
(1000's
Setting (0-
Btu/hr)
57
110
250
550
1000
1400
1800
2000
2300
*For all firing rates above, a yellow regulator spring, part #1000176 (provided) is used.
63899-002 Rev. A 3/20/2024
Table 1: LC2300M with 1 ½" Gas Line - Natural Gas
Butterfly
Valve
Gas
Actuator
90*)
Setting
(0-90*)
4.5
0
10
0
17
5.0
26.5
30
43.5
42.5
57
52
58.5
68
66.5
82.5
75
90
Figure 6
Manifold
Target
Pressure
O
(%)
Inch of
2
Water
3-4
9
3-4
9
3-4
9
3-4
9
3-4
9
3-4
9
3-4
9
3-4
9
3-4
9
Minimum Inlet
Dimension
Pressure
Inch of Water
(Burner Running)
(Figure 6)
10
10
10
10
10
10
10
10
10
"A"
Setting
3-3.25"
3-3.25"
3-3.25"
3-3.25"
3-3.25"
3-3.25"
3-3.25"
3-3.25"
3-3.25"
16

Advertisement

Table of Contents
loading

Table of Contents