Customer Cable Installation Instruction - Siemens SITRANS TDL Compact Operating Instructions

In situ laser gas analyzers
Hide thumbs Also See for SITRANS TDL:
Table of Contents

Advertisement

Connecting
6.2 Connecting SITRANS TDL
6.2.6

Customer cable installation instruction

1. Cautiously dismount emitter unit housing lid by unscrewing each of the four bolts.
2. Place the sealing nut and the
claw on the customer cable.
3. Slide the customer cable through
the gland placed on the bottom
side of the emitter unit.
4. Using the wrench (size 24) tighten the connection. The customer cable should now be
blocked in the gland.
5. Place the PE wire (green-yellow)
under the wing nut and tighten
it.
36
Sealing nut and claw on the customer cable
① Sealing nut
② Claw
③ EMC contact
Gland for the customer cable
PE wire
Compact Operating Instructions, 05\2023, A5E51659183-AA – revised 03/2024
SITRANS TDL

Advertisement

Table of Contents
loading

Table of Contents