Control Units In A Tlon Network; Tlon Network Installation - Panasonic MEW01777 Operating Instructions Manual

Table of Contents

Advertisement

Panasonic Eco Solutions Nordic AB
MEW01777
Rev: -
19.2
19.2.1
Operating Instructions Fire alarm system EBL512 G3, V2.2.x

Control Units in a TLON network

The EBL512 G3 system can be build up as a single TLON Network or
as a redundant TLON Network, i.e. two networks.
In the single TLON Network, one TLON connection board (5090)
has to be plugged in each control unit (Network no. 0) whereas in the
redundant TLON Network, two connection boards (5090) have to
be plugged in each control unit.
The redundant TLON Network supports full functionality also in case
of a network fault, i.e. open circuit or short circuit in one of the TLON
networks.
Network no. 0
When the 5090 board is on place and the network cables are
35
connected
, for each control unit, do as for a single control unit, see
1-6 in chapter 19.1 above.
When all control units are powered, the TLON network installation
(see below) has to take place before the site specific data (SSD) can
be downloaded, see Planning Instructions MEW01776.
If you know that one or more of the control units are to be started-up
later, do as follows:
- In EBLWin create SSD only for the control units that shall be
connected now. Wait to download the SSD until the TLON Network
installation is ready.
- In TLON Manager, do the TLON Network programming for the
project, i.e. only the control units that shall be connected now.
- When the TLON Network installation is ready – see below –
download the SSD.
Later, when one or more control units shall be added to the TLON
Network:
- Open the project in TLON Manager, add the new control unit(s)
and install (download) according to the separate TLON network
Operating Instructions MEW01361.
- Open the SSD in EBLWin and add the new control unit(s) and
download the SSD to all control units.

TLON network installation

A project (a system with two or more control units) is created in the
PC program TLON Manager (or has been created earlier). A PC is
connected to the modular connector "J10" (Network no. 0) in a control
unit (main board 5010). Open the project in TLON Manager and
install (download) the project, see separate TLON network Operating
Instructions MEW01361.
35
The TLON connection board is mounted on the main board 5010.
Network cable connections are made on the main board 5010, terminal block
"J4".
80

Advertisement

Table of Contents
loading

Table of Contents