Action
Checking
•
Fault message
•
Backend connection
•
SIM card
Cleaning (without filter), inside and outside
Checking charging sockets and charging cables
•
Type 2 connector lock
•
Hinged cover interlock
Check circuit breakers and the fault message on the LED topper (flashing
code)
Measurements acc. to DIN VDE, e.g.:
•
Insulation measurement
•
Grounding resistance measurement
•
Loop impedance measurement
Check axial fan for:
•
Function
•
Running noise
•
Cleaning
Once the charging station has been switched on, the fans run for 15
minutes (test mode)
Change air filters on the bottom of the charging station
Check the RCCB (semi-annual DGUV V3) including protocol
Generate maintenance log
Function test for each individual charging point:
•
Trial charge (with load or electric vehicle)
•
Type 2 connector lock
•
Hinged cover interlock
Setup time
Indication of the next test date
Read out meter readings
Perform update
Change axial fan
Travel time
A.4
Options available for orders
Option overview
These extensions can be optionally ordered for the SICHARGE CC AC22 .
SICHARGE Operating instructions, ERK
Operating Instructions, 02/2023, A5E48571690-AE
1
A.4 Options available for orders
Installa
Commis
Mainten
tion/asse
sioning
mbly
x
x
x
x
x
x
x
x
x
When an update is available
In case of fan failure
x
x
Appendix
Duration
ance
in min.
x
5
x
10
x
2
x
2
x
25
x
2
x
4
x
14
x
15
x
10
x
10
x
2
x
2
2
20
x
111