Connection Of The Unit To The Electric Network; Start-Up Recommendations; System Protection; Pre Start-Up Recommendations Of The Unit (In The Presence Of The End-User) - Salda SMARTY XP Mounting And Installation Instruction

Table of Contents

Advertisement

5.7.

CONNECTION OF THE UNIT TO THE ELECTRIC NETWORK

• Supply voltage to the unit must be connected by a qualified specialist following the manufacturer's instructions and applicable safety guidelines.
• The unit's power network voltage must correspond to
• The unit's voltage, power and other technical specifications are provided in the unit's technical decal (on the unit casing). The unit must be con-
nected to the voltage plug socket of the grounded power network in accordance with the applicable requirements.
• The unit must be earthed according to electrical equipment installation
• Using extension wires (cables) and power network plug socket distribution devices is not allowed.
• Prior to carrying out any ventilation unit installation and connection works (before the unit is commissioned), the unit must be disconnected from
the power network.
• After installation of the ventilation unit, the power network plug socket must be accessible at any time and disconnection from the power network
must be performed through the two-pole circuit breaker (by disconnecting phase pole and neutral).
• Before it is connected to the power network, the unit must be carefully checked for any damage (operation, control, and measurement nodes)
made during transportation.
• The power cable can be replaced only by a qualified technician, having evaluated the rated power and current.
The manufacturer does not assume any liability for personal injuries and property damage due to non-conformance with the
provided instructions.
5.8.

START-UP RECOMMENDATIONS

5.8.1. SYSTEM PROTECTION

The control automatics of the unit (version 1.1 / 1.2) have integrated protection against short circuit of those assemblies.
The controllers have the following protections:
miniMCB
F1 - 1A(5x20) miniMCB protection;
All units must be used with external protection device.
SMARTY
2X P 1.1
Mains Fuse
16A
SMARTY
2X V 1.1
Mains Fuse
10A
To ensure safe maintenance of the unit, it is necessary to turn off main switch and/or external protection device.

5.8.2. PRE START-UP RECOMMENDATIONS OF THE UNIT (IN THE PRESENCE OF THE END-USER)

Prior to start-up, the system must be carefully cleaned. Check for the following:
• Operation systems and unit elements as well as automation and automation devices were not damaged during installation,
• All electrical devices are connected to power supply and fit for service,
• All necessary automation elements are installed and connected to power supply and miniMCB, EX1 or S300 controller's terminal blocks,
• Cable and wire connection to miniMCB, EX1 or S300 controller's terminal blocks comply with the existing wiring diagrams,
• All electrical equipment protection components are properly connected (if they are additionally used),
• Cables and wires correspond to all applicable safety and functional requirements, diameters, etc.,
• Earthling and protection systems are properly installed,
• Condition of all seals and sealing surfaces is proper.
SMARTY v2023.2
the electro-technical
2X P 1.2
2X P S300
3X P 1.1
16A
16A
16A
2X V 1.2
2X V S300
3X V 1.1
16A
16A
16A
specifications of the unit indicated in the technical decal.
regulations.
3X P 1.2
3X P S300 4X P F2 1.1 4X P F2 1.2 4X P S300
16A
16A
3X V 1.2
3X V S300 4X V F2 1.1 4X V F2 1.2 4X V S300
16A
16A
16A
16A
16A
16A
16A
16A
EN |
21

Advertisement

Table of Contents
loading

Table of Contents